Orava – family house
Author: Ing. arch. Fero Lehocký | Zdravý dom s.r.o.
Cooperation: Ing. Igor Lobôtka
Chief Project Engineer: Zdravý dom s.r.o.
Main contractor: Kontrakting stavebné montáže spol. s r.o.,
Kontrakting KROV HROU s.r.o.
Production and assembly documentation: Ing. Lukáš Holúbek
Construction manager: Ing. Tomáš Horník
Investor: private person
Project: 2015
Completion: 2016
Built-up area of the house: 148 m2
Built-up area of the garage: 44 m2
Total floor area of the house and garage: 162 m2