{"id":24107,"date":"2018-04-24T19:53:00","date_gmt":"2018-04-24T17:53:00","guid":{"rendered":"https:\/\/kontrakting.boris-belica.sk\/this-is-how-we-built-house-barn\/"},"modified":"2025-01-22T14:16:33","modified_gmt":"2025-01-22T13:16:33","slug":"this-is-how-we-built-house-barn","status":"publish","type":"post","link":"https:\/\/kontrakting.sk\/en\/this-is-how-we-built-house-barn\/","title":{"rendered":"This is how we built &#8211; HOUSE BARN"},"content":{"rendered":"\n<p><strong>Multi-purpose wooden building in Vr\u00fatky<\/strong><\/p>\n\n<p>The wooden building is located in the garden of the original building of an old house, which belonged to the descendants of the founders of Vr\u00fatky.<\/p>\n\n<p>The low-energy building made of CLT panels is installed on a concrete, technical floor, has a red spruce fa\u00e7ade and a titanium-zinc roof with solar collectors that provide autonomous heating.<\/p>\n\n<p>The recessionist design of the exterior is based on the archetype of the barn, with an effort to make the expression of the materials used absolutely true.<\/p>\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-1024x768.jpg\" alt=\"- Kontrakting\" data-id=\"20824\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20824\" class=\"wp-image-20824\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-1024x768.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-300x225.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-768x576.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-1536x1152.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-20-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">Reinforced concrete foundation slab reinforcement<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-1024x768.jpg\" alt=\"- Kontrakting\" data-id=\"20825\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20825\" class=\"wp-image-20825\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-1024x768.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-300x225.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-768x576.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-1536x1152.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-19-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">Assembly<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"874\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-1024x874.jpg\" alt=\"- Kontrakting\" data-id=\"20826\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20826\" class=\"wp-image-20826\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-1024x874.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-300x256.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-768x655.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-1536x1310.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-18-2048x1747.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">Assembly<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"870\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-1024x870.jpg\" alt=\"- Kontrakting\" data-id=\"20827\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20827\" class=\"wp-image-20827\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-1024x870.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-300x255.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-768x653.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-1536x1306.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-18-2048x1741.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">Assembly<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-1024x768.jpg\" alt=\"- Kontrakting\" data-id=\"20828\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20828\" class=\"wp-image-20828\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-1024x768.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-300x225.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-768x576.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-1536x1152.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-17-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">Final of the roof cladding<\/figcaption><\/figure><\/li><\/ul><\/figure>\n\n<p>Simple architecture incorporated into the industrial surroundings is complemented by an expressively clean interior with an exposed structure. The layout is open, on the ground floor it allows direct contact with the garden from the lower &#8211; visiting living room. <\/p>\n\n<p>The private living room, connected to the kitchen and bedroom, is intentionally located on the first floor, from which there are more attractive views of the Mal\u00e1 Fatra mountains.<\/p>\n\n<p>The entire interior of the house will set a frame for views of the landscape. It allows immediate relaxation for an urban person who still stays close to the city, but with the feeling of touching the mountains. <\/p>\n\n<p>The joy in creating this house resulted from the unbridled openness of its owner to all the architect&#8217;s suggestions and especially thanks to the creative provocations of the owner himself.<\/p>\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16-1024x768.jpg\" alt=\"- Kontrakting\" data-id=\"20829\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20829\" class=\"wp-image-20829\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16-1024x768.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16-300x225.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16-768x576.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16-1536x1152.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-16-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">Interior<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-19.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"654\" height=\"984\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-19.jpg\" alt=\"- Kontrakting\" data-id=\"20830\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-19.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20830\" class=\"wp-image-20830\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-19.jpg 654w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-19-199x300.jpg 199w\" sizes=\"auto, (max-width: 654px) 100vw, 654px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n\n<p><strong>Construction:<\/strong> construction made of solid CLT panels and bioboards that are admitted in the interior. The ground floor is made of exposed concrete. <\/p>\n\n<p>Land area 2314m<sup>2<\/sup><\/p>\n\n<p>built-up area 108m<sup>2<\/sup><\/p>\n\n<p>Usable area 258m<sup>2<\/sup><\/p>\n\n<p><sup><em><strong>Source: <a href=\"http:\/\/www.jarina.sk\/portfolio\/dom-stodola\" target=\"_blank\" rel=\"noopener\">www.jarina.sk\/portfolio\/dom-stodola<\/a><\/strong><\/em><\/sup><\/p>\n\n<p>Author: atelier Van Jarina<\/p>\n\n<p>Supplier: Kontrakting stavebn\u00e9 mont\u00e1\u017ee s.r.o.<\/p>\n\n<p>Production and assembly documentation: Ing. Pavol Vojtu\u0161 &#8211; Contracting<\/p>\n\n<p>Construction manager: Stanislav \u010eurana \u2013 chief construction manager &#8211; Contracting<\/p>\n\n<p>Michal Hole\u0161 \u2013 roof and plumbing structures &#8211; Contracting<\/p>\n\n<p>Windows and doors: Makrowin s.r.o.<\/p>\n\n<p>Read <a href=\"http:\/\/staviamezdreva.sk\/blog\" target=\"_blank\" rel=\"noopener\">more about <\/a>prefabricated houses made of wood or <a href=\"http:\/\/staviamezdreva.sk\/kontakt\" target=\"_blank\" rel=\"noreferrer noopener\">contact us<\/a> for a consultation.<br\/><br\/>The <a href=\"http:\/\/staviamezdreva.sk\/\" target=\"_blank\" rel=\"noopener\">Staviame team from dreva.sk<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Multi-purpose wooden building in Vr\u00fatky The wooden building is located in the garden of the original building of an old house, which belonged to the descendants of the founders of Vr\u00fatky. The low-energy building made of CLT panels is installed on a concrete, technical floor, has a red spruce fa\u00e7ade and a titanium-zinc roof with [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":25249,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[85],"tags":[],"class_list":["post-24107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-how-we-built"],"acf":[],"_links":{"self":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/posts\/24107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/comments?post=24107"}],"version-history":[{"count":0,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/posts\/24107\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/media\/25249"}],"wp:attachment":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/media?parent=24107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/categories?post=24107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/tags?post=24107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}