{"id":24103,"date":"2018-04-24T19:26:00","date_gmt":"2018-04-24T17:26:00","guid":{"rendered":"https:\/\/kontrakting.boris-belica.sk\/this-is-how-we-built-aquapark-tatralandia-tatralandia-tropical-paradise\/"},"modified":"2025-01-22T14:16:40","modified_gmt":"2025-01-22T13:16:40","slug":"this-is-how-we-built-aquapark-tatralandia-tatralandia-tropical-paradise","status":"publish","type":"post","link":"https:\/\/kontrakting.sk\/en\/this-is-how-we-built-aquapark-tatralandia-tatralandia-tropical-paradise\/","title":{"rendered":"This is how we built &#8211; Aquapark Tatralandia \u2013 Tatralandia Tropical Paradise"},"content":{"rendered":"\n<p>Liptovsk\u00fd Trnovec aquapark Tatralandia \u2013 Tatralandia Tropical Paradise<\/p>\n\n<p>Author: Ing. arch. Mari\u00e1n Go\u010d, Ing. arch. D\u00e1vid Go\u010d <\/p>\n\n<p>Main contractor: Riastav s.r.o.<\/p>\n\n<p>Investor: Tatry Mountain Resort, a.s.<\/p>\n\n<p>Statics: Ing. Fedor Bet&#8217;ko<\/p>\n\n<p>Supplier of the wooden load-bearing structure: Kontrakting stavebn\u00e9 mont\u00e1\u017ee, s.r.o.<\/p>\n\n<p>&#8211; Production and assembly documentation: Ing. Juraj Pe\u010de\u0148ansk\u00fd<\/p>\n\n<p>&#8211; Construction manager: Ing. Tom\u00e1\u0161 Horn\u00edk<\/p>\n\n<p>In an effort to significantly improve the services in the Aquapark, the investor decided to build new premises (Stage I), roof the existing pools and add some functions in their immediate vicinity (Stage II).<\/p>\n\n<p>The architectural composition of the space follows the main motifs of the complex and existing buildings: water \u2013 water world \u2013 water vessels \u2013 well-being \u2013 relaxation \u2013 rest. The roofing, which is immediately connected to the main operational building, evokes the shape of a characteristic element of the water world \u2013 a shell, which allows the use of progressive foil materials to cover the space, regulating the transparency and translucency of daylight. The author of the architectural concept is Ateli\u00e9r GAM, s.r.o. from Ru\u017eomberok \u2013 Ing. arch. Mari\u00e1n Go\u010d and Ing. arch. D\u00e1vid Go\u010d.    <\/p>\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"607\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-1024x607.jpg\" alt=\"- Kontrakting\" class=\"wp-image-20780\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-1024x607.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-300x178.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-768x455.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-1536x910.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/2-16-2048x1214.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/div>\n\n<p>The main load-bearing structure of the roof consists of arched beams made of glulam timber laid on reinforced concrete columns and inclined struts. This creates a roof with a floor plan of 55 m, tapering to 35 m, 58 m long, covered with ETFE transparent thermal insulation double foil, creating a shell-shaped roof. A built-up area of more than 2,000 m\u00b2 creates a built-up area of approx. 30,000 m\u00b3. 16 pieces of wooden beams made of glulam timber, spaced from 2.3 to 3.8 meters apart, are planted with steel leeward crosses in the outer fields. The gable leeward beams absorb the forces from the roofing foil. The stiffening of the roof structure is also provided by horizontal steel horizontals located across the entire width in ten places. The wooden beam itself is composed of four segments for production, transport and assembly reasons. The construction is subtle and allows maximum illumination of the covered space. Inclined struts transfer the load from the main beams to the reinforced concrete columns. At the point of the largest span of 30 m, a wooden &#8220;frame insert&#8221; is inserted into the brackets to reduce the span to 18 m. In the calculation, the decreasing coefficients from the temperature Ct and from the topography Ce (from the blowing of the snow by the wind) were considered for the snow load. The static design of the structure was developed by Ing. Fedor Betko.           <\/p>\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"523\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-1024x523.jpg\" alt=\"- Kontrakting\" class=\"wp-image-20781\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-1024x523.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-300x153.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-768x393.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-1536x785.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/3-16-2048x1047.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/div>\n\n<p>The implementation documentation, production and assembly of the wooden supporting structure were provided by the companies of the Kontrakting group \u2013 KONTRAKTING KROV HROU, s.r.o. and Kontrakting stavebn\u00e9 mont\u00e1\u017ee, spol. s r.o. Due to the ongoing season, the investor divided the implementation into two stages. The first stage took place in May and June 2012, new spaces were created and covered with beams from two segments. The construction was completed with a temporary wooden wall. From September to November, the second stage took place, in which the pools were covered with the construction of beams from the third and fourth segments, following the first two segments from the first stage.<\/p>\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"773\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-1024x773.jpg\" alt=\"- Kontrakting\" data-id=\"20782\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20782\" class=\"wp-image-20782\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-1024x773.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-300x226.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-768x580.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-1536x1159.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/4-16-2048x1545.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"493\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-1024x493.jpg\" alt=\"- Kontrakting\" data-id=\"20786\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20786\" class=\"wp-image-20786\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-1024x493.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-300x144.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-768x370.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-1536x739.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/8-17-2048x986.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-scaled.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-1024x768.jpeg\" alt=\"- Kontrakting\" data-id=\"20785\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-scaled.jpeg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20785\" class=\"wp-image-20785\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-1024x768.jpeg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-300x225.jpeg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-768x576.jpeg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-1536x1152.jpeg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/7-2-2048x1536.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2-1024x768.jpeg\" alt=\"- Kontrakting\" data-id=\"20784\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2.jpeg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20784\" class=\"wp-image-20784\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2-1024x768.jpeg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2-300x225.jpeg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2-768x576.jpeg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2-1536x1152.jpeg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/6-2-2048x1536.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"687\" src=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-1024x687.jpg\" alt=\"- Kontrakting\" data-id=\"20783\" data-full-url=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-scaled.jpg\" data-link=\"https:\/\/kontrakting.sk\/?attachment_id=20783\" class=\"wp-image-20783\" title=\"- Kontrakting\" srcset=\"https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-1024x687.jpg 1024w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-300x201.jpg 300w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-768x515.jpg 768w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-1536x1030.jpg 1536w, https:\/\/kontrakting.sk\/wp-content\/uploads\/2021\/04\/5-16-2048x1374.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n\n<p>Read <a href=\"http:\/\/staviamezdreva.sk\/blog\" target=\"_blank\" rel=\"noopener\">more about <\/a>prefabricated houses made of wood or <a href=\"http:\/\/staviamezdreva.sk\/kontakt\" target=\"_blank\" rel=\"noreferrer noopener\">contact us<\/a> for a consultation.<\/p>\n\n<p>The <a href=\"http:\/\/staviamezdreva.sk\/\" target=\"_blank\" rel=\"noopener\">Staviame team from dreva.sk<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Liptovsk\u00fd Trnovec aquapark Tatralandia \u2013 Tatralandia Tropical Paradise Author: Ing. arch. Mari\u00e1n Go\u010d, Ing. arch. D\u00e1vid Go\u010d Main contractor: Riastav s.r.o. Investor: Tatry Mountain Resort, a.s. Statics: Ing. Fedor Bet&#8217;ko Supplier of the wooden load-bearing structure: Kontrakting stavebn\u00e9 mont\u00e1\u017ee, s.r.o. &#8211; Production and assembly documentation: Ing. Juraj Pe\u010de\u0148ansk\u00fd &#8211; Construction manager: Ing. Tom\u00e1\u0161 Horn\u00edk In [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":25213,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[85],"tags":[],"class_list":["post-24103","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-how-we-built"],"acf":[],"_links":{"self":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/posts\/24103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/comments?post=24103"}],"version-history":[{"count":0,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/posts\/24103\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/media\/25213"}],"wp:attachment":[{"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/media?parent=24103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/categories?post=24103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kontrakting.sk\/en\/wp-json\/wp\/v2\/tags?post=24103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}